Arcam AB

Assignment:
Design and improve the current design of the EBM S12 creating a new product besides the old one. Due to the low production series of the product the new design may not involve new major investments.
Design and improve the current design of the EBM S12 creating a new product besides the old one. Due to the low production series of the product the new design may not involve new major investments.
The assignment was to find a solution to package the inner works of the newly developed free form technique into a design which due to the small series is affordable to produce.
Product design of a semi automatic stretch wrapping machine.
Design study for a portable network testing device. Current product is very heavy and is based on old techniques including a mini computer with a 9" monitor.
Product design for a data interface connector box for the Lite 3000/3000E, a hand-held test solution for access networks. Graphical design of the connector box was also part of this assignment.
Make a design study for a housing of mobile computers (all in one product) based on 12" display.
Develop and (re-)design a servo driven dosing system and docking station. The new design should not only perform better then its predecessor (T2000), it should be easy to handle and it should look better.
(Re-)design and project management of a product controlling the amount of moisture in the air in attics.